DT Data Page #:
158
Newspaper:
Humboldt Times
Newspaper Date:
1/27/1948
Page #:
1
Item Type:
Bridge work
Place:
Eel river Shively
TEXT:
The B.O.S. yesterday (Monday) authorized Frank Kelly to replace the 135' feet section of the Shively low level bridge with a timber bridge. The floor will be cabled together & float at high water. It will break loose & swing over to the bank- to be restored later at low water.
Key Words:
Shively, Bridge
Microfilm Call # :