You are here

Bridge

DT Data Page #: 
222
Newspaper: 
Humboldt Times
Newspaper Date: 
6/9/1931
Page #: 
3
Column: 
6
Item Type: 
Infrastructure
Place: 
Eureka Mad River Slough
TEXT: 
Board of Supervisors met. Directed the County Surveyor to apply to Corp of Engineers for permission to change the 47.7 foot drawbridge over Mad River Slough to a fixed span of 38 feet.
Key Words: 
Change Drawbridge To Fixed Span