DT Data Page #:
360
Newspaper:
Humboldt Times
Newspaper Date:
8/13/1961
Page #:
1 & 5
Column:
1
Item Type:
Dedication
Place:
Oregon Mtn. Hazel View Tunnel
TEXT:
The work on construction a tunnel through Oregon Mtn is described. There were great challenges at the start. They are now 400ft into the mtn. The 14' X 14' feet bore will be enlarged to 43' feet wide to 20' feet tall. There is a photo taken inside the 14' X 14' foot tunnel.
Key Words:
Tunnel, Construction, Oregon Mtn.
Microfilm Call # :