You are here

Final work on southbound bridge over Mad River

DT Data Page #: 
16
Newspaper: 
Humboldt Times
Newspaper Date: 
7/10/1958
Page #: 
23
Item Type: 
Infrastructure-bridge
Place: 
Mad River
TEXT: 
The southbound bridge over Mad River is ready for final concrete pour and should be open September 1st to traffic. Lowell Allen is resident engineer. This completes the 4 lane highway from Arcata to Bella Vista Hill.
Key Words: 
Lawell Allen, Southbound Bridge