DT Data Page #:
594
Newspaper:
Humboldt Times
Newspaper Date:
3/28/1929
Page #:
2
Item Type:
Infrastructure
Place:
Eureka
TEXT:
Mercer-Fraser is constructing the new section of road at Harris Street down to Broadway at a 5% grade. This will replace the old steep dirt road. Much of the excavated dirt will be used as fill to extend Murray Street to the waterfront.
Key Words:
Mercer-Fraser
New Section Of Road
Harris Street
Broadway
Microfilm Call # :