DT Data Page #:
1
Newspaper:
Humboldt Times
Newspaper Date:
6/5/1954
Page #:
24
Item Type:
Infrastructure- Roads
Place:
Arcata Gannon St./Slough Eureka Slough
TEXT:
Arcata Freeway to open on July 13th. Work began on this (2.85) 2.8m. section Aug. 5, 1952. Two overhead structures were built. Ran from Gannon Slough to the BIg 4. Work just started on the 4 mile section from Gannon St. to Eureka Slough.
Key Words:
Arcata Freeway, Gannon Slough, Gannon St., Big 4, Eureka Slough
Microfilm Call # :