You are here

Bids received for construction bridge over Mattole River

DT Data Page #: 
6
Newspaper: 
Humboldt Times
Newspaper Date: 
7/11/1925
Page #: 
9
Item Type: 
Bids received
Place: 
Mattole River
TEXT: 
Bids will be received on 7/10/1925 at 10am for the construction of a steel cable bridge over the Mattole River at Upper Mattole. near the school house.
Key Words: 
Bridge, Mattole River, Bids Received For Construction