You are here

New bridge over South Fork Eel at Garberville done in 2 months

DT Data Page #: 
111
Newspaper: 
Humboldt Times
Newspaper Date: 
7/23/1909
Page #: 
8
Column: 
6
Item Type: 
New bridge
Place: 
South Fork Eel Garberville
TEXT: 
The new bridge over the South Fork Eel at Garberville should be done in 2 months. The steel is from the American Bridge company at Pittsburg via railroad to S.F.; then by steamer to Shelter cove, then by wagon to the bridge site. Construction was commenced last summer. Bridge is 500 feet long.
Key Words: 
Garberville, South Fork Eel, New Bridge