DT Data Page #:
111
Newspaper:
Humboldt Times
Newspaper Date:
7/23/1909
Page #:
8
Column:
6
Item Type:
New bridge
Place:
South Fork Eel Garberville
TEXT:
The new bridge over the South Fork Eel at Garberville should be done in 2 months. The steel is from the American Bridge company at Pittsburg via railroad to S.F.; then by steamer to Shelter cove, then by wagon to the bridge site. Construction was commenced last summer. Bridge is 500 feet long.
Key Words:
Garberville, South Fork Eel, New Bridge
Microfilm Call # :