DT Data Page #:
226
Newspaper:
Humboldt Times
Newspaper Date:
7/22/1920
Page #:
5
Column:
4
Item Type:
Road work
Place:
TEXT:
Paving with concrete of 4th from W to Broadway, and of Broadway south from 4th to Wabash has almost been completed by the Worswick Construction Company. Next, lime dust will be spread in preparation for laying a coat of bituminous lithic surfacing. He said the concrete from Wabash south to the city limits would have to cure for 3 weeks.
Key Words:
Paving, Broadway
Microfilm Call # :