You are here

Proposed Eel River Levee System has strong support from ranchers & dairymen

DT Data Page #: 
379
Newspaper: 
Humboldt Times
Newspaper Date: 
10/6/1963
Page #: 
5
Column: 
2 - 8
Item Type: 
Flood control
Place: 
Eel River
TEXT: 
"Proposed $22m Eel River Levee System Need Urgent, Say Ranchers Supporting Flood Control Project" Argument are put forth by about 30 ranchers & dairyman in support of the USCOE levee system designed to control floods. The levees would begin at Grizzly Bluff.
Key Words: 
Proposed, Levee, Flood Control, Eel River