DT Data Page #:
414
Newspaper:
Humboldt Times
Newspaper Date:
2/1/1925
Page #:
11
Column:
4
Item Type:
Legal Notice
Place:
Van Duzen Blackburn Grade Bridgeville
TEXT:
Bids are due 2/11/1925 on 3 bridges over the Van Duzen. Bridge #1 is to be built on the Blackburn Grade Cut-off between stations 26 & 31. Bridge #2 is to built on the Blackburn Grade Cut-off between stations 150 to 156. Bridge #3 is at Bridgeville on the site of the old wooden bridge.
Key Words:
Bids, Van Duzen, Bridges
Microfilm Call # :