DT Data Page #:
519
Newspaper:
The Humboldt Times
Newspaper Date:
10/27/1961
Page #:
14
Item Type:
Whole Page
Place:
Mayer Flat Sylvandale
TEXT:
Whole page of photos and text describing the 101 freeway under construction along the south fork Eel from Myers Flat south to Sylvandale. The Eagle Point viaduct is 1500 ft long. Lowell C. Allen was resident engineer. The section under construction is 5.6 miles long and is the first half of the 12-mile third unit of the Redwood Parks Freeway. The south end of this unit is at Sylvandale.
Key Words:
101, Construction, Describing, Lowell C. Allen
Microfilm Call # :