You are here

Work on piers for NWP Railroad bridge should be done before winter rains

DT Data Page #: 
481
Newspaper: 
The Humboldt Times
Newspaper Date: 
10/21/1911
Page #: 
1
Column: 
5
Item Type: 
Railroad work
Place: 
Eel Dyerville
TEXT: 
Work on the construction of the piers for the NWP Railroad bridge over the Eel at Dyerville should be done before the winter rains. Next spring work will resume on getting the superstructure built. After that, Dyerville will be the southern terminal.
Key Words: 
Piers, Nwp Railroad, Bridge